How We Work.
PRIMESEW — DEVELOPMENT TO DELIVERY
A Clear, Approval-Led Process.
ALIGN · DEVELOP · APPROVE · PRODUCE
Each stage creates a clear handoff to the next. We review the product, materials, construction and target requirements before sampling, then carry approved decisions into bulk production.
Six Connected Stages.
BRIEF → DEVELOPMENT REVIEW → SOURCING → SAMPLING & APPROVAL → BULK PRODUCTION → QC · PACKING · DELIVERY
Typical sample lead time: 1–2 weeks.
MOQ: 100 pcs per style.
Typical bulk production lead time: 3–4 weeks.
START A PROJECT
42 Tianhe Road, Building 16, 7th Floor, Hangzhou 311103, Zhejiang, China
Mobile / WhatsApp / WeChat: +86 13067731391
Make it stand out.
From Brief to Production.
DEVELOPMENT REVIEW · IMAGE PLACEHOLDER · 4:5
01 · Brief & Development Review
We assess product type, reference materials, construction, fit, target delivery and the development support required.
SOURCING · IMAGE PLACEHOLDER · 4:5
02 · Sourcing
Fabric and trim options are sourced and reviewed against the approved direction, performance needs and finish.
SAMPLING PROCESS · IMAGE PLACEHOLDER · 4:5
03 · Sampling & Approval
Patterns, fit, construction, and workmanship are refined through samples. Typical sample lead time: 1–2 weeks. Bulk begins only after the required approvals.
QUALITY CONTROL · IMAGE PLACEHOLDER · 4:5
04 · Bulk Production & QC
Production follows the approved sample and confirmed materials. MOQ: 100 pcs per style. Typical bulk production lead time: 3–4 weeks after approvals and material readiness, with quality checks through packing.
The PrimeSew Workflow.
SIX STAGES
01 BRIEF
02 DEVELOPMENT REVIEW
03 SOURCING
04 SAMPLING & APPROVAL
05 BULK PRODUCTION
06 QC · PACKING · DELIVERY
What You Can Expect.
Clear approvals, documented decisions and direct communication help reduce avoidable surprises as a product moves from development into manufacturing.
700,000+
GARMENTS PRODUCED ANNUALLY
3,300+
STYLES DEVELOPED ANNUALLY
126+
BRANDS SERVED GLOBALLY
FAQs
-
Our MOQ is 100 pcs per style. Final production planning is reviewed against fabric, construction, color, and customization requirements.
-
Typical sample lead time is 1–2 weeks after the development review, depending on material readiness, pattern requirements, and revisions.
-
Typical bulk production lead time is 3–4 weeks after sample approval and material readiness. The schedule is confirmed before production.
-
Sourcing begins after the brief and development review. Fabric and trim options are then aligned before sampling and approval.